Trengo to Kustomer: The Complete Migration Playbook

A 36-step runbook across six phases — track your progress, and open the right tool at every step.

0 / 36 steps complete 0%

There is no native migration path from Trengo to Kustomer. Trengo is a multi-channel team inbox with flat ticket structures and separate Profiles and Contacts, while Kustomer is a timeline-centric CRM that consolidates all interactions under a single customer record with conversations, messages, and tracking events. The fundamental gap is in data architecture: Trengo organizes work around tickets with messages and labels, whereas Kustomer uses a customer timeline model with custom Klasses, sub-statuses, and media objects that require multi-step upload workflows. Every migration requires leveraging the importedAt flag to bypass rate limits, handling the media upload dance for attachments, and converting Trengo's channel-specific data like VOIP logs into Kustomer tracking events.

The runbook

Work top to bottom. Tick steps as you go — your progress is saved in this browser.

01 Discovery Establish why you are moving, what "done" means, and who signs off. 0/5

Objective A written scope with agreed success criteria, a named owner per workstream, and a budget approved by finance.

  1. Pull the real numbers out of Trengo

    Support ops 1 day

    Export counts for tickets (open and closed separately), contacts, organisations, attachments, macros, triggers, automations, views and SLA policies. Note the oldest ticket date — history depth drives the whole timeline. Estimating from memory is the single most common cause of a blown migration window.

    Data Profiler Get real record counts instead of estimating from memory
  2. Decide what history actually moves

    Support lead 2 days

    Agree a cut-off with the support lead: all history, last 24 months, or open tickets plus a read-only archive. Every extra year of closed tickets adds API time and cost without adding much agent value. Get this in writing — it is the decision people relitigate mid-cutover.

    A "move everything" default is what turns a two-week migration into a two-month one.

    COI & ROI Calculator Build the 36-month business case you will need for sign-off
  3. Confirm Kustomer can hold your support model

    Solution architect 2-3 days

    Walk your current workflow through Kustomer: multi-brand, business hours, SLA targets, CSAT, side conversations, public vs internal notes, and any channel you depend on (voice, chat, WhatsApp, social). List anything with no native equivalent — those are project risks, not configuration details.

  4. Build the business case

    Project sponsor 1-2 days

    Model licence delta, migration effort, agent retraining, and the cost of staying put (Cost of Inaction). Executives approve a number, not a plan, and you will be asked for it again at the go/no-go.

    Helpdesk Migration Planner Turn ticket volume into a dated Trengo → Kustomer timeline
  5. Name owners and set the go/no-go date

    Project manager 1 day

    One named owner each for data, configuration, integrations, and agent enablement, plus a decision-maker who can call a rollback. Put the go/no-go meeting in calendars now, 48 hours before the freeze.

Don't move on until

  • Record counts confirmed for tickets, contacts, organisations and macros
  • Success criteria signed off by the support lead
  • Freeze window provisionally booked with the business
02 Data Audit Find out what is actually in the data before you try to move it. 0/6

Objective A profiled, cleaned export with every quality defect either fixed at source or explicitly accepted.

  1. Take a full Trengo export and profile it

    Data engineer 1-2 days

    Export to CSV or JSON and profile every file: row counts, null rates per column, distinct values, and type consistency. Compare row counts against the API totals from Discovery — a gap here means your export is silently truncated, usually by pagination.

    Data Profiler Profile the Trengo export for nulls, outliers and type drift
  2. Validate file structure before anyone writes a transform

    Data engineer 1 day

    Check delimiters, quoting, encoding (expect UTF-8, watch for BOMs and Latin-1), duplicate headers, and embedded newlines in ticket bodies. Ticket descriptions with raw newlines and commas break naive CSV parsers and silently shift columns.

    A single unescaped quote in one ticket body can shift every subsequent column without any error.

    CSV Validator Catch broken headers and ragged rows in the raw export
  3. Inventory PII and set retention

    Compliance / DPO 2 days

    Scan for emails, phone numbers, payment card fragments, national IDs and anything else regulated in ticket bodies and custom fields — support tickets are where customers paste things they should not. Decide what gets migrated, masked, or dropped, and record the legal basis.

    Ticket bodies and attachments routinely contain card and ID data that never appears in a structured field.

    PII & Compliance Scanner Find regulated fields before they land in a new system
  4. Quantify duplicates, orphans and dead references

    Support ops 1-2 days

    Count duplicate contacts (same email, different casing), tickets whose requester no longer exists, organisations with no members, and attachments whose parent ticket is gone. Fix these in Trengo where you can — migrating them just moves the mess.

    Data Cleaner Strip empty rows, stray whitespace and dead columns
  5. Clean and normalise the export

    Data engineer 2 days

    Trim whitespace, drop empty rows and columns, normalise casing on emails and tags, and standardise every timestamp to UTC ISO 8601. Timezone drift is invisible at load time and shows up weeks later as SLA reports nobody can reconcile.

  6. Produce a masked copy for sandbox work

    Data engineer 0.5 day

    Generate a realistic but fake version of the export for testing and for any vendor who needs sample data. Loading real customer PII into a sandbox is a breach in most jurisdictions, and sandboxes are rarely covered by your DPA.

    PII Masker Generate a safe copy for sandbox and vendor testing

Don't move on until

  • Export parses cleanly with no ragged rows or encoding errors
  • PII inventory complete and retention decisions recorded
  • Duplicate and orphan records quantified and triaged
03 Field Mapping Turn two schemas into one signed-off mapping spec. 0/6

Objective A reviewed field-level mapping covering every object, with an explicit decision for every field that has no target.

  1. Generate the first-pass Trengo → Kustomer field map

    Solution architect 2 days

    Start from an automated match on both schemas, then review every row by hand. Automated matching gets the obvious 70% right and is confidently wrong on the rest — especially anything named "type", "status" or "custom_field_1".

    Schema Mapper Opens pre-loaded with the Trengo → Kustomer field pair
  2. Map status, priority and channel values, not just field names

    Support lead 1-2 days

    Enumerate every value in each picklist on both sides and map them explicitly. Value-level mismatches are the defect class that survives all the way to production because the field itself mapped fine — a ticket that should be "Pending" arriving as "Open" reopens SLA clocks.

    Statuses with no target equivalent (on-hold, pending-customer) need a policy decision, not a best guess.

  3. Decide how custom fields land

    Solution architect 2 days

    Create the target custom fields first, matching type exactly (a dropdown mapped to free text can never be mapped back). Where Kustomer has no equivalent, decide between a new custom field, a tag, or a note appended to the ticket body — and record which.

  4. Resolve identity and threading

    Data engineer 1 day

    Decide how source IDs are preserved — most platforms will not let you set the primary key, so keep the original ID in a custom field. Without it, reconciliation becomes fuzzy matching and every future support question about an old ticket is unanswerable.

    Losing the original ticket ID makes reconciliation and rollback effectively impossible.

  5. Plan attachments, inline images and threading order

    Data engineer 1-2 days

    Confirm size limits, allowed MIME types, and whether inline images survive as attachments or need rehosting. Decide the comment ordering and author attribution rules: comments loaded out of order, or all attributed to the API user, destroy the conversation history agents rely on.

  6. Freeze and sign off the mapping spec

    Project manager 1 day

    Version the spec, walk the support lead through it row by row, and get explicit sign-off. Any change after this point goes through change control — mid-flight mapping edits are how partial loads happen.

Trengo → Kustomer specifics

Custom Field Validation
Confirm that custom attribute values populated correctly and weren't truncated or mistyped during the mapping.

Don't move on until

  • Every source field is mapped, deliberately dropped, or parked in a custom field
  • Status, priority and channel value maps agreed with the support lead
  • Mapping spec version-controlled and signed off
04 Test Migration Prove the pipeline on a small, representative slice. 0/6

Objective A pilot load into a Kustomer sandbox that reconciles cleanly and has been reviewed by real agents.

  1. Stand up a Kustomer sandbox that matches production config

    Solution architect 2-3 days

    Create the custom fields, groups, brands, business hours and SLA policies first. A pilot into a default sandbox tests nothing, because the failures you care about are all configuration mismatches.

  2. Pick a deliberately nasty pilot sample

    Data engineer 0.5 day

    Take 500-1000 records chosen for difficulty, not convenience: the longest ticket threads, tickets with the most attachments, non-Latin character sets, merged and split tickets, deleted requesters, and every status value. A clean random sample proves only that easy records are easy.

  3. Run the load with masked data and instrument everything

    Data engineer 1-2 days

    Log every API request and response with its source record ID. When 40 records fail out of 10,000 you need to know exactly which ones and why, without re-running the whole batch.

    PII Masker Never load real customer PII into a sandbox
  4. Measure real throughput against the rate limit

    Data engineer 1 day

    Record achieved records-per-hour under Kustomer's actual rate limits, including retries and backoff. Extrapolate to the full volume: if the maths says the full load exceeds your freeze window, you fix that now, not on cutover night.

    Published rate limits are ceilings, not throughput. Assume real-world rates are meaningfully lower once retries and backoff are counted.

  5. Reconcile the pilot and triage every failure

    Data engineer 1-2 days

    Diff source against target on record counts and field-level values. Every discrepancy gets a root cause and a fix — "probably fine" at pilot scale becomes thousands of broken records at full scale.

    Migration Validation Tool Diff the pilot batch against source before scaling up
  6. Put real agents in front of the pilot data

    Support lead 2 days

    Have two or three agents work sample tickets end to end in the sandbox. They find the things reconciliation cannot see: unreadable threading, missing context, macros that no longer make sense. Fix the mapping, then re-run.

Don't move on until

  • Pilot batch reconciles to 100% on record counts
  • Agents have reviewed sample tickets and confirmed they are workable
  • Measured throughput extrapolates to a viable full-load window
05 Cutover Execute the switch inside a controlled, reversible window. 0/6

Objective All in-scope data live in Kustomer, agents working in the new system, and a rollback path that stayed available throughout.

  1. Pre-load history before the freeze

    Data engineer 3-10 days

    Load closed tickets and contacts days or weeks ahead while Trengo stays live. Only open tickets and the final delta need to move inside the freeze — this is the single biggest lever on window length.

    Helpdesk Migration Planner Size the freeze window from Kustomer's real API limits
  2. Publish the runbook with times, owners and abort criteria

    Project manager 1 day

    A timed sequence: freeze start, final export, delta load, channel switch, smoke test, go/no-go, agent switch. Name who does each step and the explicit condition that triggers a rollback. Decide the abort criteria before the night, when nobody wants to be the one to call it.

  3. Freeze Trengo and take the final delta

    Support ops 2-4 hours

    Stop new ticket creation, let agents finish in-flight replies, then export everything changed since the pre-load. Announce the freeze to the whole business, not just support — someone always tries to raise a ticket during it.

    Tickets created during an unenforced freeze land in the old system and are the most common source of permanently lost data.

  4. Load the delta and open tickets

    Data engineer 2-6 hours

    Run the delta load, then reconcile counts before touching any channel. Do not repoint email until the delta has verified — an inbound ticket arriving mid-load is far harder to untangle than a few extra minutes of freeze.

    Migration Validation Tool Confirm the final delta landed before you reopen
  5. Repoint channels and verify with live traffic

    IT / integrations 2-4 hours

    Switch email forwarding and MX or connector settings, update chat widgets and web forms, and re-authorise integrations. Then send real test tickets through every channel and confirm each lands, routes and triggers the right automation.

    Email forwarding changes can take up to a full DNS TTL to propagate — check the TTL days in advance and lower it if needed.

    Cron Expression Builder Schedule the delta syncs that run through the freeze
  6. Run the go/no-go and switch the agents

    Project sponsor 1-2 hours

    Walk the exit criteria with the decision-maker, call it explicitly, then move agents over with a named person on hand for the first few hours. Keep Trengo read-only rather than cancelled — cancelling the old contract on day one removes your only fallback.

Don't move on until

  • Full historical load complete and counts matched
  • Inbound channels repointed and verified with live test tickets
  • Rollback decision point passed explicitly, not by default
06 Validation Prove the migration is complete, then close it out. 0/7

Objective Documented evidence that data, workflow and reporting all survived, and a signed acceptance.

  1. Run the full reconciliation

    Data engineer 1-2 days

    Compare source and target on every object: total counts, counts by status, counts by group, attachment counts, and field-level spot checks on a random sample. Produce one report you can hand to an auditor.

    Migration Validation Tool Reconcile Trengo and Kustomer record-for-record
  2. Verify field completeness, not just record counts

    Data engineer 1 day

    Re-profile the loaded data and compare null rates per field against the source profile. Matching record counts with a field that silently arrived empty is the failure mode counts alone will never catch.

    Data Profiler Prove field completeness held up through the load
  3. Rebuild reporting and compare against baselines

    Support ops 2-3 days

    Recreate your core dashboards — volume, first response time, resolution time, CSAT — and compare to pre-migration figures for the same period. Explain every variance; a changed SLA calculation is a real finding, not a rounding error.

    SLA and first-response metrics are usually recalculated from the loaded timestamps, so they will differ if any timestamp mapping was approximate.

  4. Test the workflow layer end to end

    Support ops 2 days

    Fire every trigger, automation, SLA escalation, macro and notification with a live ticket. Workflow does not migrate — it gets rebuilt — so it is untested until someone has actually watched it run.

  5. Confirm compliance and produce the audit trail

    Compliance / DPO 1 day

    Re-scan the loaded data for regulated fields, confirm retention and deletion policies are configured in Kustomer, and file the evidence with your PII decisions from the audit phase.

    PII & Compliance Scanner Produce the compliance evidence your auditor will ask for
  6. Sign off, then decommission on a schedule

    Project sponsor 1 day

    Get written acceptance against the Discovery success criteria. Keep Trengo read-only for an agreed period (30-90 days is typical), take a final archive export, and only then cancel. Diarise the decommission date so it does not quietly renew.

  7. Record Count Reconciliation

    Compare total counts of Customers, Conversations, and Messages between Trengo and Kustomer. Any discrepancy signals dropped records.

Trengo → Kustomer specifics

Sample Verification
Pull a random sample of migrated customers and manually compare their timelines against the original Trengo data. Check that messages appear in the correct order, attachments are accessible, and tags are present.
Assignment Checks
Verify that ticket ownership mapped correctly — conversations should be assigned to the same agents (or teams) that owned them in Trengo.
Workflows
Trengo Journeys must be rebuilt as Kustomer Workflows using the new data model.
Shortcuts
Organize your Quick Replies into Shortcut Categories for better agent productivity.
Search Filters
Set up Saved Searches so your agents can find the migrated tickets easily.

Don't move on until

  • Full reconciliation report attached to the project record
  • Reporting baselines match pre-migration figures within agreed tolerance
  • Formal acceptance signed and archive retention scheduled

Risk matrix

Per-object risk for this pair. Plan extra validation around anything marked high.

ObjectRiskNotes
Messages with Attachments high Three-step media upload process with blocked extension handling; failures block entire message
VOIP / Call Logs high No direct conversation equivalent; must be imported as tracking events on customer timeline
Journeys / Workflows high Must be manually rebuilt as Kustomer Workflows using the new data model
Tickets / Conversations medium Bulk creation supported with importedAt bypass but strict sequential dependency on customers
Profiles & Contacts / Customers medium Dual objects must be consolidated; single customer can be updated up to 600 times in 10 minutes
Ticket Results / Sub Statuses medium Must be pre-defined in Kustomer before ticket import for proper resolution categorization
Custom Fields / Custom Attributes medium Metadata must be defined and Klasses created before any data import begins
Labels / Tags low Direct mapping with straightforward API application to conversations
Users / Teams low API creation available but permissions require manual role mapping
Quick Replies / Shortcuts low Direct migration into shortcut categories for agent productivity

The hard parts

What makes this specific migration difficult, beyond the mechanics.

Media Upload Dance

Attachments require a three-step process of POSTing to the media endpoint, uploading the file to the temporary URL, then using the resulting ID in message creation.

Rate Limit Bypass Strategy

Standard rate limit of 120 creations per minute must be bypassed using the importedAt field flag to signal historical data during bulk conversation imports.

Blocked File Extensions

Kustomer rejects certain file types like .exe and .bat, requiring migration scripts to implement fallback logic to skip or flag these attachments.

Profile Consolidation

Trengo's separate Profiles and Contacts must be consolidated into single Kustomer Customer records while preserving all associated metadata.

Knowledge Base Three-Tier Model

Help Center migration requires creating centers, then categories, then articles with versions and blocks in strict hierarchical sequence.

What breaks

Known failure modes. Have a recovery plan for each before you cut over.

Rate Limit Responses (429 Errors):

Even with the importedAt flag, you can still hit rate limits during large migrations. Your scripts must handle 429 responses with retry logic and respect the Retry-After header returned by the Kustomer API.

Partial Failures on Bulk Imports:

A failed message import does not roll back its parent conversation. You can end up with conversation shells that have incomplete message histories. Track success/failure per record so you can backfill gaps.

Duplicate Contact Consolidation:

Trengo may have multiple Profiles for the same person (e.g., one per channel). Kustomer's timeline model expects a single Customer. If you don't deduplicate before import, you'll end up with fragmented timelines that are harder to merge after the fact.

Channel Metadata Loss:

Trengo is a multi-channel platform, and channel-specific metadata (e.g., WhatsApp Business API session data, email threading headers, live chat session boundaries) may not have direct equivalents in Kustomer. Audit which channel metadata you need to preserve and plan for manual mapping or archiving.

Open Tickets During Cutover:

Any tickets that are actively being worked in Trengo during the migration window can create inconsistencies — an agent may reply in Trengo after the ticket has already been migrated. Plan your cutover timing to minimize this window, or implement a final delta sync to catch changes made after the initial migration.

Tools used in this playbook

All free, all run entirely in your browser — nothing is uploaded.

Or skip all of this and let us handle it

Book a 30-minute call and we'll scope your migration in a single session.